1 |
Construction of distribution system for 9803 Ha. Of CCA including Command Area Development (CAD) for 9803 Ha. of CCA of Salandi Left Main Canal from RD 16.08 Km to 30.547 Km through Underground Pipe Line Irrigation System (Gravity Flow) of Anandapur Barrage Project in Balasore district of Odisha on EPC Turn Key basis. |
Balasore, Odisha |
2 |
Nagod-Satna Branch Canal including distribution system from R.D. 33.300 km. to R.D. 55.600 km. |
Satna,Madhya Pradesh |
3 |
Development of Escape Reservoir at RD 1121 of IGMN For storage of excess water for JJM schemes |
Rajasthan |
4 |
Engineering, Procurement, Construction, Testing, Commissioning, Trial Run and Operation & Maintenance of Various Components of Gandhi Sagar 1 Multi-Village Scheme, District Mandsaur & Ratlam in Single Package on ‘Turn-Key Job Basis’ including Trial Run and Operation & Maintenance of the Entire Water Supply Scheme for 10 Years |
Gandhisagar,Madhya Pradesh |
5 |
Engineering, Procurement, Construction, Testing, Commissioning, Trial Run and Operation & Maintenance of Various Components of Sidhi Bansagar Multi-Village Scheme, District Sidhi in Single Package on ‘Turn-Key Job Basis’ including Trial Run and Operation & Maintenance of the Entire Water Supply Scheme for 10 Years |
|