The table below sets forth the details of our top 10 Completed Projects in terms of project value, as of six months period ended September 30, 2024.

Sr. No. Project name Customer State Total value
(in ₹ million)*
Calendar year of completion
1 Dudhai Sub-Branch Canal Project:
Construction of Dudhai sub-branch canal reach from 11.43 to 23.02 km earth work, CC. lining, structures, service road gate work, control cabins and its operation and maintenance work for 5 years (Package-DIR- II)
Executive Engineer, K.B.C. Division No. 2/6 Bhachau / LCC SAI KSIPL JV Gujarat 3201.68 2021
2 Sitanagar Project:
Construction of composite gravity dam with pressurized irrigation network system under Sitanagar Project on EPC basis in the district Damoh (Madhya Pradesh)
Water Resources Division, Damoh Madhya Pradesh Madhya Pradesh 2,668.52 2023
3 Parbati Dam, Madhya Pradesh:
Construction of composite gravity dam on river Parbati of least gross capacity Of 172.54 Mcm on turnkey basis (Parbati)
Customer 3# Madhya Pradesh 1,462.65 2023
4 Kachchh Branch Canal Project:
Construction of long canal syphon between Ch. 215.272 Km to 217.217 Km and CR At Ch. 215.235 Km. of Kachchh branch canal (earth work, CC lining, structures, gates & stop logs, services road control cabin and O & M work for 5 Years
Customer 4# Gujarat 1,412.50 2016
5 KBC Pkg IV:
Constructing distributory canals including its minors (UGPL), sub minors (UGPL) off taking from Gagodhar sub branch canal except Gagodhar tail distributory including O & M for five years.(Package-IV) (KBC)
Executive Engineer, K.B. C. Division No. 2/6 Bhachau / LCC SAI KSIPL JV Gujarat 1,315.21 2019
6 Madiya Dam, Madhya Pradesh
Construction of composite gravity dam on river Bina of gross capacity of 270.10 Mcm on turnkey basis (Madia)
Customer 7# Madhya Pradesh 1,247.68 2023
7 UGPL Dabhoi Pkg -– 10:
Supplying, installing & testing of UGPL system of sub minor for irrigation through kundies in chak area for SSP command of various sub minors under jurisdiction of Executive Engineer, N P canal Dn. No. 4A, Dabhoi with five years maintenance (Package-10)
Customer 8# Gujarat 1,211.05 2019
8 Kachchh branch canal (IR-11-12):
Construction of branch canal reach ch. 284.486 to 296.501 km of KBC (sub-contract)
Customer 9# Gujarat 1,184.49 2022
9 Construction of Pipe Line Distribution Network for command area of 7109Ha. including detailed designing with Construction as per approved design, formation of WUA, handing over the command area to WUA, maintaining the whole system for a period of 60 months after completion, out of which first 3 years irrigation with WUA and next 2 years handing over the area to WUA and irrigation with them for GURUKUNJ LIS Tq. Tiwasa Dist. Amravati. Executive Engineer, Amravati Irrigation Division, Amravati. Dist. Amravati. Maharashtra 1,155.86 2022
10 Tawa Project, Hosangabad:
Lining of Tawa left Bank main canal from R.D. 45780m to 90240m of Tawa Project, Hosangabad
Customer 10# Madhya Pradesh 997.29 2018